
A strategic master planning study examining Port Melbourne Yacht Club's long-term expansion and adaptation through to 2050, addressing institutional sustainability within a changing coastal environment. The project engaged fundamental questions about how community organisations remain viable whilst responding to climate impacts, population growth, and evolving public expectations.
The planning response centred climate adaptation as primary driver: addressing sea level rise, shoreline erosion, and increased flooding risk through integrated architectural and landscape strategies rather than defensive infrastructure alone. Modular construction methodology enables phased expansion over three decades without disrupting ongoing operations or requiring comprehensive redevelopment.
Revenue diversification and community activation examined how facility programming might strengthen long-term viability and position the club as accessible community infrastructure.
The architectural language drew from industrial marine tradition, responding authentically to Port Melbourne's working waterfront context. Kinetic facade treatments create environmental responsiveness and street-level activation, establishing visual legibility and public engagement.
The project examines how community institutions can be genuinely future-proofed: what architectural and planning strategies enable substantive long-term adaptation within increasingly constrained coastal environments, rather than reactive crisis response.
- Client
- Port Melbourne Yacht Club
- Location
- Port Melbourne, VIC
- Programme
- Community
- Status
- Proof of ConceptProof of Concept and Master planning through to 2050
- Size
- Three buildings including existing boatshed and clubhouse.
- Architect
- Tandem Design Studio
- Designer
- Carey Landwehr, Priscilla Finn, Tim Hill, Annie Crone
- Imagery
- CLAD
This project was undertaken at Tandem.